This is our second factory,
which is also our core factory.
It was established in 2013.
The business office building, machining workshop, assembly workshop and test machine workshop are all here.
This is our machining workshop.
This is the most valuable workshop in the whole factory.
This is our machining workshop.
This is the most valuable workshop in the whole factory.
Main equipment, pellet machine, crusher, hammer mill and other main components.All are processed with imported equipment.
These high-precision processing equipment are the foundation of Yulong's ability to produce high-quality equipment
Next to the machining is the spare parts warehouse.Processed parts will be temporarily stored here.
Motors and bearings are also placed here
This is our assembly workshop. Pellet machines, hammer mill and many other equipment.
You can see that there are many devices being assembled and assembled here.
These are packed devices waiting to be shipped.
Between the warehouse and the assembly workshop is our test machine workshop
All materials brought by customers will be tested here.
There is a simple production line here
It includes a hammer mill, two pellet machines
The above is the introduction of our first and second factories.
Company Advantages
Our company has professional installation engineers team and specialized after-sale service team. When the machinesarrive your factory, we will send our installation engineers to your factory Our engineers will Guide you to install the machinesand training your workers how to operate the machines and maintain the machine.
We have first-rate design ability ,first-rate product supply ability, first-rate installation service,first-rate product quality control standards,first-rate program comparison optimization ability and first-rate customer service consciousness.
YULONG was founded in August 1988.YULONG has 32 patents on its own R&D products, has passed the ISO9001 quality management system certification, EU CE ,SGS certification and so on
Certifications and Patents
Frequently Asked Questions about
Q:Precautions Before Installation and Commissioning
A:① Site preparation: whether the handling tools, hoisting tools, assembly tools, water and electricity are complete, whether the raw materials are in place, and whether there are obstacles (columns, roofs) on the installation site;
② Determine the operating technicians and operators;
③ Confirm whether there is a pit and whether the size is correct and reasonable;
④ Check whether the issued equipment number is missing and whether the manual is complete.
⑤ According to the material granulation, whether the equipment is complete.
⑥ Explain safety common sense to the on-site staff and give technical guidance.
⑦ After the installation and debugging is completed, the customer's technicians or operators must clarify the main equipment of the production line, and follow the instructions for operation and maintenance. The set time of the dry oil pump, the maintenance simulation operation of no oil at the oil outlet.
Q:How to Assemble / Disassemble the Pellet Mill
A:We have a detailed Assemble / Disassemble Instruction Video, please click the link to view:https://www.woodpelletmill.net/service
Q:How long is your guarantee?
A:12 months warranty but except quick waering parts.
Q:Notes in Pellet Processing
A:1.Before the worker gets on the machine, the operator must read the instruction manual carefully to understand the various technological processes of the equipment.
2.In the production process, strictly follow the procedures and operation sequence, and carry out the installation operation as required.
3.The main equipment needs to be installed and fixed on a flat concrete floor and fixed with screws.
4.Smoking and open flames are strictly prohibited at the production site.
5.After each boot, it needs to be idle first. After the equipment runs normally without abnormality, the material can be fed evenly.
6.It is strictly forbidden to add hard impurities such as stones and metals into the feeding device. In order to avoid damage to the granulation chamber, iron should be removed before granulation.
7.It will be dangerous, if the material is moved by hand or other tools during the operation of the equipment.
8.If abnormal noise occurs during the production process, the power supply should be cut off immediately. After checking and handling the abnormal situation, the production can continue.
9.The feeding must be stopped first, and then the machine should be shut down. After the raw materials of the feeding system are processed, the power supply should be cut off.
Q:Will you send engineers to install the machines?
A:Of course. Our company has professional installation engineers team and specialized after-sale service team. When the machinesarrive your factory, we will send our installation engineers to your factory Our engineers will Guide you to install the machinesand training your workers how to operate the machines and maintain the machine.