Shandong Yulong helps you move forward. Welcome to the strength factory series,In the next few days, I will take you to learn about the Yulong factory.Let everyone know why Yulong's equipment is so excellent
It's our first meeting. Let me show you around.
After more than 20 years of development, Yulong company now has four factories.
This is our first factory, also the earliest one.Yulong Machinery Factory was established here in 1998 and the earliest office area and production area were located here.
This is the predecessor of Shandong Yulong Machine Co., Ltd.
Now this is mainly a restaurant, staff dormitory, and raw material warehouse
As well as the assembly of electrical cabinets and some simple equipment processing
Company Advantages
We have first-rate design ability ,first-rate product supply ability, first-rate installation service,first-rate product quality control standards,first-rate program comparison optimization ability and first-rate customer service consciousness.
Our company has professional installation engineers team and specialized after-sale service team. When the machinesarrive your factory, we will send our installation engineers to your factory Our engineers will Guide you to install the machinesand training your workers how to operate the machines and maintain the machine.
YULONG was founded in August 1988.YULONG has 32 patents on its own R&D products, has passed the ISO9001 quality management system certification, EU CE ,SGS certification and so on
Certifications and Patents
Frequently Asked Questions about
Q:How to Assemble / Disassemble the Pellet Mill
A:We have a detailed Assemble / Disassemble Instruction Video, please click the link to view:https://www.woodpelletmill.net/service
Q:Notes in Pellet Processing
A:1.Before the worker gets on the machine, the operator must read the instruction manual carefully to understand the various technological processes of the equipment.
2.In the production process, strictly follow the procedures and operation sequence, and carry out the installation operation as required.
3.The main equipment needs to be installed and fixed on a flat concrete floor and fixed with screws.
4.Smoking and open flames are strictly prohibited at the production site.
5.After each boot, it needs to be idle first. After the equipment runs normally without abnormality, the material can be fed evenly.
6.It is strictly forbidden to add hard impurities such as stones and metals into the feeding device. In order to avoid damage to the granulation chamber, iron should be removed before granulation.
7.It will be dangerous, if the material is moved by hand or other tools during the operation of the equipment.
8.If abnormal noise occurs during the production process, the power supply should be cut off immediately. After checking and handling the abnormal situation, the production can continue.
9.The feeding must be stopped first, and then the machine should be shut down. After the raw materials of the feeding system are processed, the power supply should be cut off.
Q:How long is your guarantee?
A:12 months warranty but except quick waering parts.
Q:Precautions Before Installation and Commissioning
A:① Site preparation: whether the handling tools, hoisting tools, assembly tools, water and electricity are complete, whether the raw materials are in place, and whether there are obstacles (columns, roofs) on the installation site;
② Determine the operating technicians and operators;
③ Confirm whether there is a pit and whether the size is correct and reasonable;
④ Check whether the issued equipment number is missing and whether the manual is complete.
⑤ According to the material granulation, whether the equipment is complete.
⑥ Explain safety common sense to the on-site staff and give technical guidance.
⑦ After the installation and debugging is completed, the customer's technicians or operators must clarify the main equipment of the production line, and follow the instructions for operation and maintenance. The set time of the dry oil pump, the maintenance simulation operation of no oil at the oil outlet.
Q:Voltage requirement?
A:Our machines can use 380V, 220V, 240V, 415V, 480V, and 50Hz, 60Hz.